folbot

UNFOLD NEW ADVENTURES. IN MINUTES.

User-friendly instructions. Quick, easy assembly.

  

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:18 a.m.

Kate arrives at the dock with a Greenland II in its two bags.

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:22 a.m.

Parts have been removed from the bags and laid out for beginning assembly.

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:29 a.m.

Both halves of the frame are assembled and ready to go into the skin.

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:32 a.m.

Each half is inserted into the skin, one at a time.

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:36 a.m.

The bottom and side frames are locked into position, and the last three frames added.

Watch as Kate assembles a
Greenland II in about 20 minutes.

9:40 a.m.

Washboards are added last, side sponsons inflated, and Kate is ready to paddle.
replay animation


INSTRUCTIONS DOWNLOAD

AleutDownload (PDF)
CitibōtDownload (PDF)
CooperDownload (PDF)
EdistoDownload (PDF)
Greenland IIDownload (PDF)
KiawahDownload (PDF)
KodiakDownload (PDF)
YukonDownload (PDF)